John Gowrie

Finish Carpenter and Woodworker

Boxes for the Built-ins

Yesterday I cut and assembled the boxes for the built ins. For now they have been screwed together with both predrilled connections and pocket-hole connections. Once I am positive they will fit the wall openings, I will break them down, glue and reassemble them.

20140309-125541.jpg

Dresser Built-ins arrow-right
Next post

arrow-left Built-ins For Older Home
Previous post

Leave a Reply